1、首先將圍欄系統(tǒng)和限位拆除,將副鋼絲繩拆除,將一邊吊籠拆除,將帶有天窗一邊的吊籠部件拆除,在吊籠框內(nèi)用抱箍等把吊桿緊固。
Lift manufacturers introduced first fence system and limit removed, the deputy rope removed, the side of the cage removed, the side of the cage with a skylight parts removed, the box in the cage with a hoop and other fastening the boom.
2、其次把平衡鐵架拆除,然后將第一道纜風(fēng)繩拆除,在頂框邊綁扎一根長(zhǎng)1m的腳手架鋼管并掛上一個(gè)可吊重量為0.5T~1T的開(kāi)口滑輪。把導(dǎo)向掄附件安裝于標(biāo)準(zhǔn)節(jié)的側(cè)上方。
Second, the balance comes to lift manufacturers formwork removal, then the first wind cable rope removed, lashing at the top rim of a long 1m steel scaffolding and hang a weight hanging pulley opening of 0.5T ~ 1T. The guide picked
accessory mounted on the upper side of the standard section.
3、再拆除曳引鋼絲繩,拆掉曳引輪,裝上拆卸卷筒,將拆卸鋼絲繩從卷筒引出,經(jīng)過(guò)導(dǎo)向輪,頂滑輪后向下,中部系緊于吊桿的內(nèi)下桿處,末端從吊桿滑輪處引出。
Lift manufacturers say then remove the traction rope, removed the traction wheel, mounted on the reel demolition, the removed the rope from the drum leads, through the guide wheel, pulley after top-down, central lacing on the next shot at the boom , drawn at the end of the boom pulley.
4、最后將標(biāo)準(zhǔn)節(jié)逐一拆除,當(dāng)拆到纜風(fēng)繩時(shí),要先將纜風(fēng)繩拆除后方可拆卸標(biāo)準(zhǔn)節(jié),將曳引機(jī)構(gòu)及基礎(chǔ)節(jié)拆除。
Lift manufacturers introduced one by one and finally the standard section removed, when split to wind cable rope, first dismantle the wind cable rope standard removable rear section, the traction mechanism and the basis of section
removed.